Ganzhou Magnets

Pre-RFQ material screen

Neodymium Magnets for Electric Motors: Thermal Screen

Screen a candidate class and its risks before requesting a quote.

Published on 2026/03/24

Last updated 2026/11/08

Published by Ganzhou Magnets. Editorial screening methodology; no rotor testing is claimed.

Electric Motor Magnet Fit Checker

Screening only, not design approval. Enter magnet temperatures, not ambient temperature.

Defaults: high torque, humid, balanced — adjust here

Defaults: high torque, humid exposure, balanced priority.

Required whole numbers: continuous 40–300C, peak 60–350C, window 2–52 weeks. Peak >= continuous.

Recommendation output

No result yet

Enter temperatures and run the screen. After editing an input, run it again for an updated result.

Need help preparing inputs? Start RFQ support
80C150C180C200C220C350CSH:150C*UH:180C*EH / AH:200/220C*SmCo 2:17:250–350C*

* Catalog references, not rotor safety limits.

Core conclusions before you request quotes

Most quote mismatch happens because buyers anchor on grade names but skip thermal margin, coating validation, and supply risk assumptions.

Thermal gate first

150 / 180 / 200 / 220C

Arnold catalog references for SH/UH/EH/AH, not safety limits. Geometry and opposing field determine the final grade.

Source

NdPr price moved up again

$55 -> $69/kg

USGS MCS 2026 reports the average NdPr oxide price rose from $55/kg in 2024 to $69/kg in 2025, so RFQ buffers should not assume flat raw-material pricing.

Source

High-temp crossover is real

>150C crossover

VAC's March 2026 brochure says selected VACOMAX SmCo alloys can deliver higher energy density than selected VACODYM NdFeB above 150C. Treat that as a working-point-specific counterexample, not a universal rule.

Source

Good fit for

  • Traction and servo teams comparing SH/UH/EH/AH classes
  • Sourcing managers who need thermal rationale before supplier shortlisting
  • Programs that require corrosion + thermal evidence in the same RFQ pack

Not suitable when

  • You already completed FEM + demag bench tests and only need commercial bidding
  • Peak above 220C: outside this screen; review SmCo or redesign without approving either.
  • Application is outside rotating electric motors (different load-line assumptions)

Market and supply signals you should not ignore

Historical data, not current prices or lead times. Implications are procurement interpretations; confirm rules and availability for each shipment.

Swipe horizontally on mobile to read the full table.

MetricHistorical value / scenarioDateDecision implication
Global REO mine output390,000 t REO (China 270,000 t)USGS MCS 2026, February 2026; 2025 estimatesConcentration remains high. Keep at least one contingency chemistry or class lane for high-temp programs.
U.S. rare-earth net import reliance67% of apparent consumptionUSGS MCS 2026, February 2026; 2025 estimatesLead-time assumptions should include policy/logistics shock buffers, not only nominal supplier lead time.
Rare-earth import source concentration (U.S.)China 71% (2021-24 average import source)USGS MCS 2026, February 2026; 2025 estimatesIf your grade requires Dy/Tb-rich classes, qualify at least two supply routes before tooling lock.
Average NdPr oxide price$55/kg (2024) -> $69/kg (2025)USGS MCS 2026, February 2026; 2025 estimatesDo not freeze long-volume contracts without a raw-material reset clause or alternate class lane.
China export-control triggerAnnouncement No.18 added controls on selected medium/heavy rare-earth items and permanent magnet materialsMOFCOM, effective 2025-04-04Ask suppliers to disclose controlled-item exposure and licensing route, not just factory location.

Methodology and logic chain

The planner intentionally mirrors engineering handoff: thermal envelope -> material shortlist -> coating route -> validation gate -> procurement path.

Thermal gateMaterial pathCoating gateRFQ laneWithout geometry, opposing field and B-H curves, safety and torque cannot be calculated.

Step 1: Thermal envelope gate

Peak magnet temperature selects a SH/UH/EH/AH reference. Continuous temperature checks input consistency (peak >= continuous); peak duration and thermal cycling are not modeled.

Step 2: Catalog reference headroom

Subtract peak from the class reference. Below 15C requires review: this is an editorial screening rule, not calculated coercivity reserve or a safety threshold.

Step 3: Corrosion route selection

Exposure band drives coating and test load (e.g., NiCuNi baseline, epoxy for coolant/humidity), but salt-spray hours alone do not prove field lifetime.

Step 4: Launch pressure and control-lane adjustment

Aggressive prototype windows and controlled-item licensing risk increase fallback pressure and can require alternate material planning before PO.

Motor magnet thermal screen showing UH, 180C reference, 170C peak and 10C headroom
Software execution, 2026-11-08: continuous 120C, peak 170C, 10 weeks, high torque, humid exposure, balanced priority. Result: UH, 10C headroom, review required. Panel capture; this is not a physical test or customer performance evidence.

Evidence layer and source disclosure

Each conclusion is tied to an external source and date marker. Standards pages are included to keep validation scope explicit.

Swipe horizontally on mobile to read the full table.

SourceWhat we use from itDate marker
USGS Rare Earths chapter (MCS 2026)2025 estimates: world rare-earth output 390,000 t REO, China 270,000 t; U.S. net import reliance 67%, China supplied 71% of U.S. imports (2021-24), and average NdPr oxide price increased from $55/kg (2024) to $69/kg (2025).February 2026; 2025 estimates
China MOFCOM Announcement No.18 of 2025Effective 2025-04-04, export controls were added on selected medium/heavy rare-earth compounds, metals, oxides, alloys, mixtures, and permanent magnet materials.Published 2025-04-04
DOE Electric Drive Technologies roadmap (2023 consensus)Traction motor research context and rare-earth-free alternatives; this is not a current price or universal cost benchmark.March 2024 roadmap
VAC product information: VACODYM / VACOMAXLists NdFeB and SmCo performance windows, states NdFeB operating temperature depends on working point/coercivity, and notes selected VACOMAX SmCo alloys can exceed selected VACODYM energy density above 150C.Published 2026-03
IEC 60404-18:2025Defines open-circuit magnetic property measurement for permanent magnets, including self-demagnetization correction and suitability for high Hcj materials.IEC 60404-18:2025; checked 2026-11-08
IEC 60068-2-11:2021Defines salt mist test procedures for quality control and detection of coating discontinuities before shipment.IEC 60068-2-11:2021; checked 2026-11-08
ASTM B117-26 pageConfirms salt spray exposure itself does not prescribe interpretation or exposure duration, so it should not be treated as a direct field-life predictor.Updated 2026-01-19; checked 2026-11-08
European Commission electric motors pageProvides current EU ecodesign scope and milestone context for motors and variable speed drives, which matters when a procurement team mixes traction and industrial motor assumptions.Checked 2026-11-08
IEC TS 60034-30-2:2016Covers efficiency classes for variable-speed AC motors, including PM synchronous machines not operated directly on-line, so regulatory scope should not be generalized across all motor programs.IEC TS 60034-30-2:2016; checked 2026-11-08
Arnold Magnetic Technologies: NdFeB catalogSH 150C, UH 180C, EH 200C and AH 220C catalog references; these do not qualify a specific rotor.Checked 2026-11-08

Reviewed 2026-11-08. Editions and statistics retain their historical dates. This is not a complete register of current controls or a price forecast.

Material route comparison for motor programs

Use this table to discuss tradeoffs with engineering and procurement in one review instead of separate meetings.

Swipe horizontally on mobile to read the full table.

Decision dimensionNdFeB SH/UHHigh-coercivity NdFeB / GBDSmCo 2:17
Typical BHmax windowGrade dependent; compare curvesGrade dependent; compare curves20-33 MGOe
Max operating class150-180CEH 200C / AH 220C (catalog reference)250-350C
High-temperature energy retentionStrong at 20C, but advantage can shrink as temperature risesBetter high-temp coercivity, still working-point dependentSelected grades can overtake selected NdFeB above 150C
Corrosion baselineCoating required for sustained humidity/media exposureCoating required for sustained humidity/media exposureOften coating-optional, but still verify mating-system corrosion
Rare-earth exposure objectiveNo, still rare-earth dependentNo, but heavy-rare-earth loading can be optimizedNo, shifts to Sm/Co route rather than removing rare-earth exposure
Metrology requirement before class lockIEC 60404-5 or 60404-18 + FEM/load-line checkPrefer IEC 60404-18 for high Hcj + demag correctionSame metrology + thermal cycle mechanical checks
Best fit scenarioMainstream EV/servo with <=180C peaksHigh-load motors with thin thermal marginHotspot >220C or severe thermal cycling

Typical BHmax window

VAC figures span complete alloy families, not equivalent SH/UH/EH/AH grade windows.

Max operating class

GBD is a process, not a thermal class. Arnold references apply; VAC also lists special alloys up to 240C. The 220C ceiling only limits this tool.

High-temperature energy retention

VAC March 2026 data shows a real counterexample: some SmCo alloys outperform some NdFeB alloys above 150C. Do not generalize that crossover beyond the disclosed working point and alloy family.

Corrosion baseline

VAC states high-cobalt SmCo can resist prolonged hot-humidity exposure better, but ASTM B117 and IEC 60068-2-11 remain screening tools rather than direct life models.

Rare-earth exposure objective

If rare-earth avoidance is the first objective, DOE roadmaps point to non-permanent-magnet alternatives with expected energy-density, NVH, or weight penalties.

Metrology requirement before class lock

Skip direct cross-supplier comparison when measurement method is not explicitly disclosed.

Best fit scenario

Validate with FEM + demag bench before volume release.

Concept boundaries and applicability conditions

Use these gates to avoid overgeneralizing catalog data into production decisions.

Swipe horizontally on mobile to read the full table.

ConditionPreferred interpretationCaution zoneDo not conclude yet
Thermal margin to class ceiling>=25C: class discussion can proceed with normal validation cadence.15-24C: keep contingency grade lane and run early demag verification.<15C: do not lock supplier by price only.
Catalog BHmax vs operating-temperature working pointCompare demag curves and working point at the actual operating temperature.Using BHmax or Br at 20C as the main supplier-ranking metric.Treating a better room-temperature catalog number as proof of better motor output.
Corrosion proofASTM B117 / IEC 60068-2-11 pass with defined acceptance criteria.Salt spray pass only, but no field medium mapping.No coating test scope or undefined acceptance criteria.
Data comparability across suppliersMeasurement method disclosed (IEC 60404 family) and same working point.Method disclosed but demag correction/work point differs.No disclosed method, only headline BHmax.
Efficiency or regulation scopeConfirm whether the motor is actually in scope for EU 2019/1781 or IEC TS 60034-30-2.Using industrial IE classes as a shortcut for traction or custom servo motor decisions.Assuming EV traction, inverter-fed PMSM, and direct-on-line industrial motors share the same compliance path.

Thermal margin to class ceiling

15C and 25C are editorial planning rules, not standards or safety guarantees.

Catalog BHmax vs operating-temperature working point

VAC and IEC metrology sources both point to the same boundary: motor decisions fail when room-temperature catalog data replaces in-service magnetic behavior.

Corrosion proof

ASTM B117 itself does not define duration choice or field-life interpretation.

Data comparability across suppliers

Without metrology comparability, cross-quote ranking is unstable.

Efficiency or regulation scope

Regulatory scope changes the test/document path, but it does not replace the magnet working-point decision.

Known unknowns (explicitly pending)

Public benchmark price by grade class + coating + geometry

Status: No reliable open consolidated dataset

Next step: Use normalized RFQ templates and supplier-side quote evidence instead of scraped list prices.

Supplier-specific Dy/Tb loading by high-temp grade

Status: Mostly proprietary across vendors

Next step: Request disclosure windows or at least substitution risk notes in NDA-based technical review.

Universal conversion from salt-spray hours to in-field lifetime

Status: No standard one-to-one conversion

Next step: Pair salt-mist tests with application-specific coolant/humidity cycling and teardown criteria.

Public lead-time benchmarks for controlled rare-earth export items

Status: No reliable open dataset

Next step: Require suppliers to disclose controlled-item exposure, licensing responsibility, and backup origin plan in the RFQ pack.

Risk matrix and scenario outcomes

Editorial qualitative matrix: these are not measured probabilities or customer test results.

HighMediumLowLowMediumHighImpactProbability

Swipe horizontally on mobile to read the full table.

RiskProbabilityImpactMitigation
Thermal misclassification (using SH where AH is needed)MediumHighRequire operating-temperature B-H curves, FEM and bench tests before approval.
Coating under-validation in coolant/salt environmentsMediumHighTie coating plan to ASTM B117 + IEC 60068-2-11 and define field-correlated acceptance criteria early.
Rare-earth price and availability shockHighMediumMaintain two qualified grade windows, add a raw-material reset mechanism, and keep one alternate material path open.
Export-license disruption in Dy/Tb or controlled-item lanesMediumHighTrack control updates, ask suppliers to declare controlled-item exposure, and pre-qualify fallback class/material options before PPAP.

Illustrative scenarios, not validated customer cases

Scenario A: EV traction rotor, peak 170C, humid bay

Premise: Program targets high torque density with moderate lead-time flexibility.

Process: Inputs 120/170C, 10 weeks, high torque, humid, balanced: UH with 10C reference headroom; review required.

Outcome: Request curves and a corrosión test scoped to actual media; no universal test duration is prescribed.

Scenario B: Compressor motor, peak 235C

Premise: Thermal hotspot exceeds AH comfort zone in sustained operation.

Process: Inputs 180/235C: outside this NdFeB screen; evaluate SmCo or cooling without qualifying either.

Outcome: Request a separate review of material, cooling, geometry and sourcing before selecting an alternative.

Scenario C: Industrial servo, peak 140C, aggressive cost target

Premise: Team wants lower cost without sacrificing launch reliability.

Process: Inputs 100/140C, 4 weeks, cost-first: SH with 10C headroom and a short window; review required.

Outcome: Request SH curves and a UH alternative, and confirm the window with suppliers.

Scenario D: Existing AH design, but Dy/Tb export route is disrupted

Premise: Thermal target remains valid but one import route is delayed after a controlled-item review.

Process: Manual review outside the tool inputs: confirm chemistry, origin, licensing and alternatives before ordering.

Outcome: Review alternate routes and test equivalence; switching to SmCo does not automatically remove export controls.

FAQ: boundaries, validation, and sourcing decisions

Answers for thermal validation and a supplier quotation brief.

Thermal screening and RFQ

How do I screen neodymium magnets for electric motors?

Enter continuous and peak magnet hotspot temperatures and a prototype window. This preliminary screen selects SH, UH, EH or AH catalog references, then flags headroom, exposure and schedule concerns for supplier review. It does not calculate rotor safety, torque or service life.

Are 150, 180, 200 and 220C safe operating limits?

These are Arnold catalog references for SH, UH, EH and AH. Actual performance depends on grade, geometry, opposing field, peak duration and operating-temperature B-H curves. The 220C ceiling limits this tool; it is not a universal NdFeB limit.

Why does less than 15C headroom require review?

Headroom is the catalog reference minus the entered peak temperature. The 15C review trigger and 25C planning band are editorial rules, not standards, measured coercivity reserves or safety factors. Even a candidate result needs engineering validation.

When should SmCo be evaluated in parallel?

Above this tool’s 220C ceiling, evaluate SmCo or thermal redesign with engineering. A SmCo alternative is not approved by this output and can have its own sourcing and export-control constraints.

Can salt-spray hours predict motor magnet service life?

There is no universal conversion from salt-spray hours to service life. Define the coating, actual coolant or humidity exposure, acceptance criteria and application-specific tests with the supplier before comparing quotes.

What should I include in the motor magnet RFQ?

Include a drawing, magnetization direction, tolerances, continuous and peak magnet temperatures, peak duration, opposing field or load-line assumptions, media exposure, quantity and prototype schedule. Request operating-temperature curves and magnetic, coating and dimensional acceptance criteria.

Prepare your motor magnet RFQ

Share a drawing, tolerances, magnetization direction, magnet temperatures and peak duration, media exposure, quantity and schedule. Include your screen inputs and result when requesting supplier curves and acceptance criteria.

Primary CTA supports immediate WhatsApp/email outreach; secondary path keeps a documented engineering handoff.

Product Gallery

Electric vehicle motor

EV motor with permanent magnets

Reference Guides

Procurement-ready guides covering grades, coatings, QC, and RFQ prep.

View all resources

Request a Quote

Request a Quote
Share your magnet requirements and we will respond within 24 hours.

PDF/DWG/STEP up to 4MB

Get a Quote

Send your drawing, grade, coating, and quantity. We coordinate a supplier quote and follow up with confirmed specs.

Product data is sourced from partner suppliers and confirmed per order.

Related Pages