Ganzhou Magnets
Hybrid pageKeyword: custom magnet signsTool + report in one URL

Custom Magnet Signs: Tool-First Fit Check and Decision Report

Run the vehicle sign fit check

Run the tool to evaluate route speed, steel-zone coverage, weather stress, and maintenance readiness in under a minute. Then use the report layer to validate readability gates, evidence quality, comparison tradeoffs, and risk controls before placing a custom magnet signs order.

Scope: this checker covers removable signs mounted on exterior vehicle panels. It does not assess storefront, indoor, or stationary magnetic signs.

Whether your team searches for custom magnet signs, custom magnetic signs, or removable vehicle magnet signs, this page keeps fit checks, evidence, and next-step RFQ actions in one place.

Published 2026/03/07Last updated 2026/10/16Stage1b evidence refresh: 2026-03-03 (custom magnet signs readability-performance spec + force-envelope + scope-split + visibility controls)
What you get on this page

Preliminary rule-based screen with assumptions and required next actions.

Source-backed key numbers with date markers and known/unknown flags.

Scenario, risk matrix, and fallback plan when magnets are not the best route.

1) Fit checker (primary task layer)

Input your real route assumptions, run the result, and act immediately from the outcome-specific CTA.

Input panel

Range 8 to 48 in.

Range 6 to 30 in.

Range 20 to 85 mph.

Range 1 to 60 months.

Range 1 to 20,000 units.

Defaults are tuned for a local-to-regional custom magnet signs campaign. Update values to match your route lanes, steel coverage, and cleanup ownership.
Result and next action

No result yet.

Submit the checker to get a preliminary rule-based fit band, pressure context, and required next actions.

Wind load cue (dynamic pressure trend)

At 55 mph, the equation gives dynamic pressure near 370 Pa. This pressure trend does not measure force on the sign or verify its actual retention margin.

2) Core conclusions and decision signal

These are the decision statements to align procurement, operations, and installer teams before RFQ lock.

Conclusion

Material floor for vehicle duty

30 mil magnetic sheeting

For vehicle magnet campaigns, default to vehicle-grade 30 mil with rounded corners and full-surface contact checks.

Conclusion

Operational success driver

Daily or near-daily removal

Maintenance discipline is a higher predictor of field success than print style or color count.

Conclusion

High-speed trigger

Risk jumps above 60 mph

Aerodynamic load grows with velocity squared, so marginal installs fail fast as top speed climbs.

Conclusion

Fallback decision boundary

Mixed-material body + highway route

If steel coverage is partial and route speed stays high, removable vinyl/wrap usually outperforms magnets.

Conclusion

Commercial-fleet compliance gate

50 ft legibility + no obscured reflectors

When a vehicle is in FMCSA scope, removable markings still need two-side daylight legibility and cannot cover required lamps or reflective devices.

Conclusion

Sign readability is a legal gate in CMV scope

50 ft daylight legibility on both sides

49 CFR 390.21T allows removable devices but still requires readable, contrasting two-side markings in operation. Fit-only decisions are insufficient for regulated fleets.

Conclusion

Highway lanes change retention math quickly

65 mph is ~1.40x load vs 55 mph

Dynamic pressure scales with velocity squared. A sign setup that feels stable on city routes can move to pilot-only at higher sustained speeds.

Conclusion

Maintenance cadence drives sign survival

Daily remove-clean remains baseline guidance

Vehicle-sign care guidance treats daily cleaning and dry re-install as core controls against trapped moisture, grit abrasion, and edge lift.

Conclusion

Panel composition uncertainty is rising

Regular steel -250+ lb; plastics/composites +~40%

DOE trend data supports mandatory steel-zone verification for each vehicle before approving magnet-sign rollout.

Stage1b source mapping for new core conclusions (updated 2026-03-03; 49 CFR 390.21T rechecked in eCFR 2026-10-16)

ConclusionSourceDateBoundary note
Removable signs in CMV scope still need 50 ft legibility49 CFR 390.21T (current temporary CMV-marking text)eCFR checked 2026-10-16The current eCFR lists § 390.21T; the non-temporary § 390.21 is marked suspended indefinitely. Confirm FMCSA scope and the applicable rule with a fleet compliance owner; passenger-fleet rules can differ by state and locality.
65 mph vs 55 mph aerodynamic load sensitivityNASA Glenn: Dynamic pressureAccessed 2026-03-03Equation trend is robust, but turbulence, install quality, and body geometry still require pilot validation.
Daily remove-clean cycle as baseline sign-care controlMagnum Magnetics vehicle-sign clean & care guidanceRev 2024-05, accessed 2026-03-03Vendor guidance must be checked against selected media datasheet and local climate conditions.
Mixed-material panel risk trend over timeUS DOE Fact #980 (lightweight materials trend)Published 2017-06-05, accessed 2026-03-03Aggregate historical trend, not a VIN-level map for each fleet unit.

3) Key numbers snapshot

Reference numbers used in this page, each with a direct implication for go/no-go decisions.

MetricValueWhy it matters
Minimum install temperature (manufacturer guidance)>=60°F (16°C)Below this range, sheet stiffness and imperfect contact can raise lift risk.
Operating caution band for flexible magnetic media-15°F to 160°FOutside this envelope, brittle behavior or heat softening can reduce predictable hold and finish safety.
Vehicle cleaning cadence for magnetsDaily recommendedCleaning cadence is a direct control for moisture/grit damage and retention reliability.
Fresh-paint wait guidance (magnetic signage)~90 days paint / 60 days clear coat / 2 days waxEven a “fit” result can become a finish-risk project if substrate cure timing is skipped.
CMV regulation trigger (federal scope)>=10,001 lbs threshold in 49 CFR 390.5TThis separates projects that need FMCSA marking/conspicuity controls from general passenger-car campaigns.
CMV legal marking readabilityLegible from 50 ft in daylight (both sides)If legal identifiers are on removable magnets, route operations need explicit pre-dispatch checks.
Trailer conspicuity baseline80 in+ width and >10,000 lbs GVWR trigger classLarge-trailer branding must preserve required reflective treatment corridors.
Dynamic pressure at 55 mph370 PaLoad increases quickly with speed; 65 mph carries materially higher pressure than city-route speeds.
Dynamic pressure at 65 mph517 PaUse this as a planning breakpoint when deciding if a magnet pilot is still appropriate.
Wrap reference durability (3M stated warranty)Up to 8 years vertical / up to 3 years horizontalAlternative media can be lower-risk for long-horizon programs.
Dynamic pressure delta: 65 mph vs 55 mph~+40% load (1.40x)Sign campaigns that look stable in city lanes can move to pilot-only at sustained highway speeds.
CMV removable-marking readability conditionBoth sides + contrast + 50 ft daylight legibility (49 CFR 390.21T)Physical hold is not enough when signs also carry legal identifiers for regulated operations.
Vehicle-sign care cadence baselineDaily remove-clean-dry cycle recommendedSkipping cleaning cadence increases moisture/grit abrasion and edge-lift risk even when initial fit is good.
Light-vehicle material shift (DOE Fact #980)Regular steel -250+ lb; plastics/composites +~40%Panel composition uncertainty raises mismatch risk unless steel zones are verified per vehicle.

Secondary CTA

Need a quote-ready decision now? Share sign dimensions, lane-speed profile, and whether legal IDs are included so we can confirm fit and readability controls before artwork lock.

4) Suitable vs unsuitable buyer profile

Use this split to route the page visitor toward magnets, pilot mode, or fallback media without ambiguity.

Best fit users
  • Local or regional fleets that can verify steel door zones
  • Teams needing fast campaign swaps without adhesive downtime
  • Operations with documented handling and cleaning ownership
Not ideal users
  • Highway-dominant fleets with mixed-material vehicle bodies
  • Programs expecting multi-year no-maintenance branding
  • Teams without owner accountability for remove-clean routines

5) Method and calculation logic

This preliminary screen applies fixed rules to sign size, speed, panel, and care inputs. Its classification is not calibrated against retention tests or a field-failure dataset.

Step 1: Input normalization

Convert dimensions to area, speed to dynamic pressure trend, and handling cadence to maintenance burden.

Step 2: Risk scoring

Apply fixed rule penalties for mixed-material panels, speed bands, large area, harsh climate, and weak cleaning discipline; these weights are not statistically calibrated.

Step 3: Boundary gating

Apply non-negotiable gates where magnets are likely misapplied (for example mixed-material body plus sustained highway speed).

Step 4: Action output

Return a preliminary rule-based band, pressure context, and required pilot actions. The band is not a probability or approval to install.

6) Evidence layer and source register

Every critical claim is tied to a source and date marker. Unknowns are treated explicitly instead of hidden by generic copy.

SourceSignal usedDate
Magnum Magnetics Clean & Care (Rev 5/24)Vehicle signs: remove/clean daily; avoid below -15°F or above 160°F; paint cure guidance ~90 days (paint), 60 days (clear coat), 2 days (wax/seal); rounded corners recommended.2024-05
Magnum Flexible Magnets FAQ (support PDF)Install at 60°F (16°C) or above; daily cleaning recommended for vehicle-mounted signs; avoid non-flat/non-steel placement.2024
49 CFR 390.5T (current CMV definition)The current eCFR definition includes the 10,001 lb interstate weight threshold plus passenger-count and hazardous-material cases. Confirm scope per vehicle with a fleet compliance owner.eCFR checked 2026-10-16
49 CFR 390.21T (current temporary CMV-marking text)The current eCFR text requires both-side display, contrast, and 50 ft daylight legibility for applicable CMVs. The non-temporary § 390.21 is marked suspended indefinitely; confirm applicability with a compliance owner.eCFR checked 2026-10-16
49 CFR 393.9 (lamps and reflective-device obstructions)Section 393.9(b) says required lamps and reflective devices/material must not be obscured by added vehicle or work equipment.eCFR checked 2026-10-16
49 CFR 392.33 (obscured lamps or reflective devices/material)Section 392.33(a) prohibits driving a CMV when required lamps or reflective devices/material are obscured by added vehicle or work equipment.eCFR checked 2026-10-16
49 CFR 393.11 (Conspicuity systems)Large trailers (80 in+ width, GVWR >10,000 lbs, manufactured on/after 1993-12-01) require reflective treatment under FMVSS 108 references.eCFR checked 2026-10-16
3M Wrap Film 2080 product supportWarranty messaging cites up to 8 years for vertical exposure and up to 3 years for horizontal exposure.Accessed 2026-02-20
NASA Glenn dynamic pressure referenceDynamic pressure q = 1/2 * rho * v^2; aerodynamic load scales directly with q.Accessed 2026-02-20
FHWA Nighttime Visibility OverviewRoughly half of traffic fatalities happen at night while about one quarter of travel occurs after dark.Updated 2025-09-26
US EPA UV Index scaleUV Index 8+ is classified as very high to extreme, supporting faster fade-risk assumptions for exposed graphics.Updated 2026-01-22
49 CFR 390.21T (current temporary CMV-marking text)Current eCFR text permits removable markings subject to both-side display, contrast, and 50 ft daylight legibility; the non-temporary § 390.21 is marked suspended indefinitely. Confirm applicability with a fleet compliance owner.eCFR checked 2026-10-16
NASA Glenn dynamic pressure referenceq = 1/2 * rho * v^2; aerodynamic load grows with speed squared for sign retention planning.Accessed 2026-03-03
Magnum Magnetics Clean & Care (vehicle sign guidance)Daily remove-clean cycle, install at >=60°F, and avoid non-supported panel surfaces for vehicle magnets.Rev 2024-05, accessed 2026-03-03
US DOE Fact #980 (vehicle material mix trend)Regular steel declined >250 lb/vehicle while plastics/composites increased ~40%, raising panel mismatch risk.Published 2017-06-05, accessed 2026-03-03

Stage1b audit closure: gap-to-evidence register

Gap found in prior roundStage1b information incrementEvidence tierBoundary / counterexampleMinimum executable control
Sign-first copy lacked explicit legal readability gate in CMV scenarios.Added direct 49 CFR 390.21T mapping for two-side display and 50 ft daylight legibility conditions on removable devices.Regulatory text (CFR)Applicability depends on FMCSA scope; passenger-fleet enforcement can vary by state/local rules.Keep legal-ID layer separated from promo signs unless dispatch checks enforce in-route readability.
Highway risk language was directional but not quantified.Added aerodynamic ratio context (65 mph ~= 1.40x load vs 55 mph) from NASA dynamic-pressure equation.First-principles modelFormula alone does not capture turbulence spikes or installation defects.Run route-speed pilots on highest-exposure lanes before full sign production.
Maintenance guidance was treated as best practice, not control requirement.Promoted daily remove-clean-dry handling to explicit gate using manufacturer sign-care guidance.Primary manufacturer documentationDifferent media vendors may specify tighter or looser handling windows.Attach SOP ownership and first-month cadence logs to rollout approval.
Panel mismatch risk lacked macro-level context for modern fleets.Added DOE lightweight-material trend evidence to justify steel-zone verification by vehicle.Government dataset summaryHistorical trend data cannot replace panel-level hold tests on real units.Capture panel photos + hold-test records before print lock.

7) Regulatory applicability and compliance gates

Commercial fleet projects can fail after a good fit score if legal marking or conspicuity constraints are ignored. This matrix separates operational fit from legal fit.

TriggerRequirement signalApplies whenMagnet-specific riskMinimum control
CMV applicability threshold49 CFR 390.5T includes an interstate 10,001 lb vehicle/combination-weight category, with separate passenger-count and hazardous-material categories also in the definition.Commercial fleets only; many passenger vehicles are out of FMCSA scope but still subject to state laws.Teams assume all vehicles follow the same rule set and miss where federal marking/conspicuity rules begin.Classify each vehicle by regulation scope during intake (CMV vs non-CMV) before artwork lock.
Company/USDOT marking visibility49 CFR 390.21T requires both-side markings that contrast sharply and are legible from 50 ft in daylight.Interstate CMVs displaying legal identifiers, including removable marking methods.If a removable magnet carries legal IDs and slips, curls, or gets removed, compliance can fail mid-route.Keep legal IDs off optional promo magnets or add pre-dispatch legibility checks with owner sign-off.
No obscured required lighting/reflectors49 CFR 393.9(b) says lamps and reflective devices/material required by its subpart must not be obscured; 49 CFR 392.33(a) prohibits driving a CMV while those required devices are obscured.Any CMV where magnet placement can overlap lamps, reflective tape, or mandated reflectors.Large promotional magnets can partially cover required visibility hardware on vans/trailers.Use placement templates with “no-cover zones” and confirm clearances in install photos.
Trailer conspicuity requirements49 CFR 393.11 links many trailers (80 in+ wide, >10,000 lbs GVWR, post-1993 builds) to reflective treatment rules.Box trailers and larger units in regulated categories; not every light-duty passenger vehicle.Magnetic graphics near mandated conspicuity stripes can create avoidable inspection or roadside issues.Treat conspicuity tape corridors as locked zones and route branding to validated alternate panels.

Stage1b go / no-go gates (risk and tradeoff controls)

Decision gateGo whenNo-go whenProof to collectFallback path
Legal readability ownershipCMV applicability is confirmed and both-side 50 ft readability checks are part of dispatch SOP.Teams treat removable promo signs as legal-ID replacement without operational checks.Compliance checklist + side-by-side install photos at daylight readability distance.Keep legal IDs on permanent compliant markings and use magnets for non-mandatory campaign content.
Panel substrate verificationAll intended sign zones are confirmed ferromagnetic steel with test evidence.Planned zones include unknown, aluminum, or plastic body sections.Vehicle panel map + hold-test log by installation zone.Move non-steel zones to vinyl/wrap and reserve magnets for verified steel areas.
Speed-lane validationPilot data shows stable hold at planned top speed with no persistent edge lift.High-speed routes show repeated lift or detach events.Route pilot report with speed/weather logs and post-shift inspection records.Use adhesive media for highway-dominant lanes; keep magnets for short-run local campaigns.
Maintenance executionNamed owner follows remove-clean-dry cadence and tracks exceptions weekly.No owner exists or cleaning cadence is not operationally realistic.SOP card + maintenance logs captured for first 30 days.Switch to lower-touch media for campaigns without upkeep capacity.

Evidence update marker: Stage1b increment completed on 2026-03-03 for custom magnet signs with explicit readability-performance gates (including no fixed-height shortcut), speed-to-force envelope bounds, interstate-vs-intrastate scope split checks, and visibility-effect evidence. The federal marking source was rechecked against eCFR on 2026-10-16. Where public evidence is incomplete (for example, a unified state passenger sign matrix), this page keeps those items marked as pending confirmation.

8) Option comparison (magnets vs alternatives)

Use this table when campaign duration, panel compatibility, or operations discipline suggest a different medium.

OptionSetupRemovalPanel dependencyDurability windowRisk profileBest use
Custom car magnetsFast deployment; no adhesive curingHigh (designed for repeated removal)Requires ferromagnetic steel panelsUse-condition dependent; cleaning cadence is decisiveEdge lift, moisture trap, fly-off if handling weakShort campaigns, fleet swaps, temporary branding
Spot vinyl decalsModerate install with surface prepMedium (adhesive removal effort required)Works on most painted panelsLonger than magnets when installed correctlyAdhesive residue, paint sensitivity on removalSemi-permanent branding with low daily handling
Full/partial wrap filmLongest install; professional application preferredMedium with trained removal processBroad panel compatibility3M guidance: up to 8 years vertical / up to 3 years horizontalHigher upfront cost and removal planning complexityLong-horizon brand programs with stable vehicle roster

Counterexamples and limit-condition cases

CaseWhy baseline output can misleadWhat breaks firstMinimum decision action
Fresh repaint or new clear coat on door panelTool physics may return fit, but substrate cure readiness is not auto-detected from route inputs.Finish risk rises if magnets are installed before cure windows (manufacturer guidance: ~90 days paint, 60 days clear coat).Delay magnet install until cure window is confirmed; use temporary alternate media if campaign start is fixed.
CMV legal identifier mounted on removable magnetTool evaluates hold and maintenance, not legal-readability continuity during dispatch changes.A removed or damaged magnet can break 50 ft legibility or two-side identifier expectations for regulated vehicles.Use permanent legal markings and keep campaign magnets separate from mandatory ID content.
Trailer side zones near required reflective treatmentFit score may stay high while placement conflicts with conspicuity corridors are outside the current scoring model.Magnets can obscure required reflective devices/tape on regulated trailers, creating enforcement exposure.Lock “no-cover” corridors in templates and enforce photo QA before vehicle release.
Passenger-vehicle state-law placement edge casesNo unified public US dataset fully normalizes state-level restrictions for private vehicle sign placement.A design that is operationally stable can still hit local placement or visibility constraints.Mark as pending review: confirm state/local rules before scaling to multi-state fleets.
Readable static mockup but low-contrast text at night route conditionsTool fit can pass while actual roadway legibility fails under glare and low-light conditions.Campaign signs become difficult to read at distance, undermining both compliance and marketing outcomes.Run night-distance readability check before production release.

9) Boundaries, known limits, and unknowns

Trust the result only inside these boundaries. If inputs cross the line, use the fallback action instead of stretching assumptions.

Boundary conditionTrust result whenWatch out whenFallback action
Panel material certaintySteel panel map confirmed before print approvalUnknown panel mix on newer vehiclesRun steel-only placement template or shift to decal/wrap
Route speed profileCity route with sustained speeds <=55 mphFrequent highway exposure >60 mphPilot at real route speed or switch media
Handling disciplineDocumented cleaning and reapplication routineMagnets left in place for long intervalsAssign owner + checklist or avoid magnet route
Weather / UV stressModerate UV and non-coastal dutyHigh UV + salt + winter slush cyclesLaminate upgrade + shorter refresh cycle + stricter checks
Regulatory visibility constraints (CMV lanes)Legal IDs and required reflective/lighting zones are isolated from removable promo magnetsMagnets are used as mandatory identifiers or placed near conspicuity hardwareSplit legal markings from campaign graphics and lock no-cover placement templates

Known unknown register

Unknown itemCurrent statusImpactMinimum next step
Exact steel coverage by model year and trimUnknown at quote intake for many fleetsIncorrect media choice and higher failure riskCollect panel map photos or run magnet hold test per body zone
Real cleaning behavior by operatorsOften untracked after deploymentMoisture trapping, paint haze, edge liftAssign owner, add weekly log, include escalation trigger
Actual highway exposure versus planned routeDispatch changes can invalidate assumptionsDynamic pressure rises and hold margin collapsesPilot on highest-speed lane before full rollout
Wash chemistry and pressure setting varianceRarely controlled fleet-wideGraphic abrasion and adhesive/edge stressDefine approved wash SOP and remove magnets pre-wash
State-by-state private vehicle sign-placement limitsPending confirmation (no unified public US dataset)Multi-state campaigns can pass tool fit but still fail local placement constraints.Run legal/operations review by deployment state before scaling beyond pilot.
Public benchmark for lifecycle cost by mediumPending confirmation (no reliable public dataset with consistent national methodology)Upfront-only pricing can hide maintenance labor and replacement-frequency cost.Build internal 90-day pilot cost ledger before committing long-horizon media choice.
Unified state-level rule matrix for private passenger magnet signsPending confirmation (no single normalized public dataset)Teams can overgeneralize federal CMV logic to passenger fleets and miss local restrictions.Confirm placement and readability constraints per deployment state before rollout.

10) Risk matrix and mitigation plan

Risk is presented as probability x impact with concrete controls. This section is for implementation teams, not only procurement.

High-impact/high-probability cells should trigger pilot or fallback media before purchase order release.

RiskProbabilityImpactMitigation
High-speed edge lift and fly-offMediumHighLimit speed by route policy, verify corner radius, and complete pilot run at peak route speed.
Finish haze from trapped moisture and gritMediumMediumDaily or near-daily remove-clean-dry cycle and clean mounting surface.
Incorrect placement on non-steel body panelsHighHighPerform pre-install steel verification; do not deploy magnets on aluminum/plastic zones.
Design fades faster under high UV dutyMediumMediumUse UV-stable print stack, shorten refresh interval, and prioritize high-contrast layouts.
Campaign mismatch (temporary medium used for long-term route)MediumMediumUse the comparison matrix early and switch to vinyl/wrap for multi-year programs.
Regulatory visibility conflict on CMV deploymentsMediumHighKeep legal IDs/permanent conspicuity elements separate from removable magnets and enforce install-photo audits.

11) Scenario walkthroughs

Illustrative scenarios use stated assumptions; none are customer case studies, measured field results, or deployment approval.

Local plumbing fleet (city routes)

Assumptions: 22 x 18 in magnet, 50-55 mph max speed, steel door panels validated, twice-weekly cleaning.

Outcome: Illustrative lower-speed, steel-panel scenario only; these assumptions are not measured route results and do not prove retention.

Next step: Confirm the exact panel and media data, then complete a representative route pilot before production.

Regional delivery vans (mixed highway)

Assumptions: 24 x 24 in magnet, regular 65-70 mph highway use, mixed panel materials, weekly cleaning.

Outcome: Illustrative risk case: mixed panels and sustained highway speeds require panel mapping and route testing; no retention rating is established here.

Next step: Verify each steel zone and test the selected media on the planned route, or use an approved alternative on non-steel panels.

Coastal service vehicles (salt + high UV)

Assumptions: 30 x 18 in magnet, coastal humidity, UV index frequently high, daily field usage.

Outcome: Illustrative planning case: coastal moisture, UV exposure, and cleaning cadence require supplier data and field checks; service life is not established here.

Next step: Confirm the selected print stack with its supplier, define a care plan, and validate the setup in a route pilot.

Campus fleet for event promotion

Assumptions: 20 x 14 in magnets, low speed, short campaign, strict install discipline.

Outcome: Illustrative short-route scenario only; supplier data and route testing are still required before release.

Next step: Verify the exact vehicle panels and media data, then complete a 14-day pilot on representative vehicles before batch production.

Dual-use service fleet with seasonal campaigns

Assumptions: 24 x 18 in signs, mixed city/highway duty, steel-door zones verified, daily removal assigned to drivers.

Outcome: Conditional-to-fit. Program can scale if speed-lane pilots and readability checks remain within control thresholds.

Next step: Run 2-week route pilot, record edge-lift trend, and lock no-cover/legibility templates before batch print.

12) Decision FAQ

Grouped answers for tool usage, field operations, and media switching decisions.

Custom magnet signs FAQs

14) Move to quote with reduced ambiguity

Send this result context to the team so engineering, purchasing, and operations can start from the same assumptions.

Use this page as a single decision lane: run the tool, validate evidence and limits, choose the medium, then submit the quote package. If your result is conditional or not-fit, include pilot/fallback requirements in the inquiry note to avoid rework loops.

Specifications

Primary use caseRemovable vehicle signs on verified steel panels; this page does not assess indoor or stationary signs
Baseline material route30 mil vehicle-grade magnetic sheeting with rounded corners
Core operating variablesRoute speed, panel material, weather lane, and cleaning cadence
Result payloadPreliminary rule-based fit band, pressure context, assumptions, and required pilot actions
Decision boundaryMixed-material body + sustained highway speeds usually requires fallback media
Primary CTAQuote + pilot planning via WhatsApp/email inquiry

Need a quote-ready specification review?

Share your drawing, grade target, coating, and quantity. We align supplier feasibility before full RFQ submission.

Reference Guides

Procurement-ready guides covering grades, coatings, QC, and RFQ prep.

View all resources

Quote Calculator

Quick quote calculator

Estimate lead time and prepare a precise RFQ.

Based on standard production ranges. Final quote after drawing review.

Request a Quote

Request a Quote
Share your magnet requirements and we will respond within 24 hours.

PDF/DWG/STEP up to 4MB

RFQ checklist

  • Dimensions and shape (include drawing if possible).
  • Grade and operating temperature range.
  • Coating or surface treatment requirements.
  • Quantity, target price, and delivery schedule.
  • Tolerance, magnetization direction, and application notes.

Spec sheet downloads

Reference assets to speed up RFQ prep. Confirm specs before ordering.

NdFeB spec sheet (reference) preview

NdFeB spec sheet (reference)

Grades, coatings, and RFQ checklist for NdFeB magnets.

SmCo spec sheet (reference) preview

SmCo spec sheet (reference)

High-temperature SmCo summary and RFQ checklist.

Ferrite spec sheet (reference) preview

Ferrite spec sheet (reference)

Cost-optimized ferrite basics and RFQ checklist.

Alnico spec sheet (reference) preview

Alnico spec sheet (reference)

High-temperature Alnico grades and RFQ checklist.

Bonded NdFeB spec sheet (reference) preview

Bonded NdFeB spec sheet (reference)

Bonded NdFeB process notes and RFQ checklist.

Flexible rubber magnet spec sheet (reference) preview

Flexible rubber magnet spec sheet (reference)

Flexible magnet tape basics and RFQ checklist.

Magnetic assembly spec sheet (reference) preview

Magnetic assembly spec sheet (reference)

Pot magnet assembly fundamentals and RFQ checklist.

Get a Quote

Send your drawing, grade, coating, and quantity. We coordinate a supplier quote and follow up with confirmed specs.

Product data is sourced from partner suppliers and confirmed per order.

Related Pages